
Executed for the Maharashtra State Road Development Corporation (MSRDC), the work includes gabion wall installations, slope stabilization techniques, and catch water drain construction. These interventions strengthen the expressway’s resilience against natural hazards, ensuring secure and uninterrupted travel on this vital corridor.
November 1, 2019:
Design and Execution of Rockfall Mitigation at Amrutajan Bridge to Adoshi, Khandala, and Bhatan Tunnel
November 30, 2019
Construction of Additional Rockfall Mitigation Works at Khandala Mumbai Corridor, Amrutajan (Expressway) & Gabion Work near Khandala Tunnel, including catch water drain above Adoshi Tunnel
