Atal Tunnel (Project Yojak)

Atal Tunnel (Project Yojak)

Atal Tunnel (Project Yojak)

Slope Stabilization & Avalanche Protection – Himachal Pradesh

Slope Stabilization & Avalanche Protection – Himachal Pradesh

Chief Engineer Project Yojak

Chief Engineer Project Yojak

Chief Engineer Project Yojak

29 December, 2023

29 December, 2023

29 December, 2023

The project focuses on rockfall mitigation, slope stabilization, and avalanche protection along the Approach Road to the South Portal (ARSP) of the Rohtang Tunnel (now Yojak) in Himachal Pradesh. Given the region’s challenging terrain and extreme weather conditions, the work involves advanced geotechnical solutions to ensure slope stability and safeguard the roadway from avalanches and falling debris. The implementation of protective barriers, reinforced slopes, and controlled drainage systems enhances safety and accessibility, ensuring year-round connectivity through this critical mountain pass.

Himachal Pradesh

Himachal Pradesh

Himachal Pradesh

India

India

India

info@pfepl.com

022 48011311

Headquarters

B2 508/509, Boomerang, Off. Chandivali Farm Road,

Chandivali, Andheri East, Mumbai, Maharashtra - 400072

info@pfepl.com

022 48011311

Headquarters

B2 508/509, Boomerang, Off. Chandivali Farm Road,

Chandivali, Andheri East, Mumbai, Maharashtra - 400072

info@pfepl.com

022 48011311

Headquarters

B2 508/509, Boomerang, Off. Chandivali Farm Road,Chandivali, Andheri East, Mumbai, Maharashtra - 400072